EMAG vertical lathe loading and unloading solution

EMAG vertical lathe loading and unloading: gantry robot or six-axis robot with automated storage and feeding, designed on the part and the cycle.

Gantry robot units in assembly
Machine family · vertical lathe · loading and unloading

EMAG vertical lathe loading and unloading solution

EMAG vertical lathe loading and unloading: gantry robot or six-axis robot with automated storage and feeding, designed on the part and the cycle.

vertical lathe · robot automation
Overview

What EMAG vertical lathe loading and unloading covers

This page covers one machine family: the vertical lathe of EMAG, used where loading, clamping, unloading, part transfer and continuous production are still done by hand.

EMAG Group is based in Germany. Its main models include VSC and VL series inverted vertical lathes, VLC vertical turning centers.

Depending on the machine structure, the part size and weight, the cycle time, the fixture form, the production quantity and the shop layout, a cell can be built from a gantry robot, a six-axis robot, automated part storage, an automatic feeding mechanism, finished-part collection and an inspection unit, joining the manual handling motions into one continuous automatic cycle.

Where machining runs for long stretches, manual repetition has to come out and one operator has to cover several machines, the design has to answer seven questions at the same time:

  1. How the part is stored
  2. How the part is fed
  3. How the robot grips it
  4. How the machine clamps it
  5. How it is removed after machining
  6. How the finished part is collected
  7. How the next part comes in

Real vertical lathe automation is therefore not one more robot on the floor: the machine, the feeding, the gripping, the fixture, the control and the safety interlocks form one production cell.

EMAG vertical lathe automation: Rotary storage and transfer unit
Rotary storage and transfer unit
01

Why a EMAG vertical lathe needs automated loading and unloading

In vertical lathe work, manual loading and unloading usually consists of:

  • Blank onto the loading conveyor
  • Part located
  • Spindle moves down to pick
  • Spindle moves up and clamps
  • Machining area closes
  • Turning
  • Spindle moves down to unload
  • Part drops to the discharge conveyor
  • Clean and check
  • Prepare the next part

When the cycle is stable, the part range is fairly uniform and the machine runs for long stretches, those repeated motions can be joined by an automation system. The machining characteristic here is loading and unloading carried out by the spindle itself, a stable cycle per part and chips and center of gravity falling downwards — which is exactly what makes the repeated motions worth fixing.

Taking EMAG as the example: The inverted vertical structure of an EMAG lathe means the spindle itself picks the part up: the workpiece is taken straight from the conveyor or the pallet and machined. External automation therefore concentrates on continuous feeding along the loading conveyor, separating the discharge and transferring between machines.

The system does not simply put a robot where an operator stood. It makes the following run in a fixed order:

  1. Feeding
  2. Picking
  3. Clamping
  4. Machining
  5. Unloading
  6. Collection

Add automated part storage and frequent manual replenishment turns into:

  1. Storage buffer
  2. Automatic feeding
  3. Robot picking
  4. CNC machining
  5. Finished-part collection

The concept for a EMAG vertical lathe therefore has to be designed from the whole production cycle, not from a robot model number.

02

How a EMAG vertical lathe loading and unloading system works

A typical automatic cycle can be designed as:

  1. Blank in
  2. Loading conveyor or pallet location
  3. Spindle moves down and picks the part
  4. Spindle moves up and clamps the part
  5. Machining area closes
  6. Vertical turning
  7. Machining complete
  8. Spindle moves down and unloads
  9. Part drops onto the discharge conveyor or pallet
  10. Inspection and sorting
  11. The next part enters the cycle

Each of those motions needs its own state confirmation, for example:

  • Has the part reached the loading position
  • Has the spindle picked it correctly
  • Is the chuck clamped
  • Is the machining area closed
  • Has the machining program finished
  • Has the part dropped to the discharge position
  • Is there chip or coolant build-up at the unloading station

The part is brought to the lower station by conveyor or pallet and the spindle moves down to pick it up and up into the machining area, so the spindle down travel, the height of the loading station, the conveyor position and the guard opening range have to be confirmed in the design.

The stability of an automatic system comes from the interlocks between those states, not from robot speed alone.

03

Loading and unloading methods for a EMAG vertical lathe

01 Gantry robot loading and unloading

A gantry robot normally runs on a fixed path. It suits: machines that stay in position and stand in a row, a clear loading path, a fairly stable part range with continuous batches, a defined cycle, and one robot serving several machines. Typical structure: automated part storage → gantry robot → machine → finished-part collection.

02 Six-axis robot loading and unloading

A six-axis robot has a larger working envelope. It suits: handling motions that are complex or need the part flipped, several machines plus an inspection station, a wide part range with frequent changeover, and connecting deburring, washing or inspection. Typical flow: storage → robot → machine → robot → inspection or finished-part area.

03 Automated part storage and feeding

Automated part storage is the link that turns manual bar handling into buffering: blanks queue in the magazine and the robot takes them to the cycle, so replenishment becomes a scheduled batch job instead of a per-part one. It suits sites that want to lengthen the replenishment interval, a fairly uniform part range that can be supplied by tray or basket, night shifts or long unattended stretches, and several lathes sharing one feeding and collection route.

Choosing between them

Handling unitMatching feed methodBetter suited to
Gantry robotStorage magazine plus a fixed feed laneMachines in rows, stable batches, a defined cycle
Six-axis robotStorage magazine plus trays or basketsSeveral part types, several stations, flipping and inspection
Gantry robot plus robotMagazine feeding, robot unloads and sortsA tight loading cycle where unloading needs separation and sorting

The handling unit and the feeding method are two separate decisions: they can be chosen independently or combined.

04

EMAG vertical lathe with automated part storage

Where the shop needs more than automatic handling — where frequent manual replenishment also has to come out — automated part storage is added in front of the machine and the system becomes:

  1. Storage magazine
  2. Automatic discharge
  3. Location
  4. Robot or gantry
  5. EMAG vertical lathe
  6. Machining
  7. Finished-part collection

The storage magazine can take on:

  • Blank storage
  • Part buffering
  • Automatic feeding
  • Part location and selection
  • Managing several batches
  • Finished-part buffering
  • Feeding several machines
05

One robot, two machines: EMAG vertical lathe

When two EMAG vertical lathes have cycles, part sizes and a layout that suit shared feeding, the following can be designed:

  1. Storage magazine
  2. Gantry or robot
  3. vertical lathe 1
  4. vertical lathe 2
  5. Finished-part collection

That forms one multi-machine automation cell. A one-to-two configuration has to be calculated on:

  • The cycle time of both machines
  • The robot pick-and-place time
  • The door opening time of both machines
  • The part weight
  • The robot payload
  • The robot travel
  • The distance between the two machines
  • The storage capacity
  • The scheduling logic when both machines finish at the same time

Not every pair of machines can share one robot. If the two cycles differ widely, or the machines stand too far apart, the robot path, the buffering method and the feeding structure have to be re-assessed.

06

Three machines and multi-machine lines for EMAG vertical lathes

Extended further, the cell becomes:

  1. Storage magazine
  2. Robot
  3. Machine 1
  4. Machine 2
  5. Machine 3
  6. Inspection
  7. Finished parts

On a multi-machine line the focus has already moved from loading and unloading to production task scheduling, part buffering, robot path and machine status management. The system has to decide:

  • Which machine has finished
  • Which machine is waiting for a load
  • Which part should go into which machine
  • Whether the magazine holds the matching part
  • What the robot should do next
  • Whether the other machines keep running after one alarms

A third machine is not simply added to the cell: the whole task scheduling and buffering logic has to be redesigned.

07

Which parts suit EMAG vertical lathe automatic loading

Whether a part suits automated loading is decided by the part first. Across the typical work of a vertical lathe, the common candidates are:

Disc and brake parts

  • Brake discs
  • Brake drums
  • Clutch parts
  • Wheel hubs

Housing and short-shaft parts

  • Gearbox housings
  • Bearing housings
  • Short shafts

Flange and ring parts

  • Flanges
  • Ring parts
  • Cover plates

Automotive and new-energy parts

  • Automotive parts
  • New-energy parts
  • General machinery parts

Whether a specific part suits automatic loading has to be confirmed on size, weight, shape, material, cycle time, clamping method, locating datum and the pose it arrives in. A name such as "shaft" or "disc" on its own is not a conclusion.

EMAG vertical lathe cell: CNC lathes combined with an automation cell in a workshop
CNC lathes combined with an automation cell in a workshop
08

Part characteristics decide the automation method

This is one of the most important layers of the selection. On a vertical lathe:

Part conditionDesign focus
Uniform sizeFixed fixture and fixed feeding
Small sizePrecision location, purpose-made fixture, light-payload gripping
Heavy partRobot payload and fixture load matched to the chuck size
Several sizesChangeable fixture, configurable trays, recipe management
Fixed incoming orientationMechanical location
Random incoming orientationVision recognition / flexible feeding
Needs the other face machinedRobot flipping or a purpose-made flipping mechanism
Several operationsTransfer between operations by robot
Judgement needed after machiningAutomatic inspection plus OK / NG sorting
Long continuous productionAutomated part storage plus automatic feeding

The concept therefore starts from the part, not from a robot model number.

09

How EMAG vertical lathe loading solves clamping

In automated loading the machine fixture is a critical link. On a vertical lathe the clamping form is the spindle chuck, and the system has to consider:

  • Vertical spindle chuck type and size
  • Gripping face and soft-jaw design
  • Part locating datum
  • Spindle pick-up present detection
  • Clamp confirmation signal
  • Interference between the loading conveyor and the spindle travel
  • Discharge drop and damage protection
  • Chip and coolant build-up at the unloading station

Typical working cycle:

  1. Part reaches the loading position
  2. Spindle moves down
  3. Spindle picks the part
  4. Spindle moves up
  5. Chuck clamped
  6. Machining area closed
  7. Machining
  8. Spindle moves down and releases

The machine only moves to the next state after the clamped condition is confirmed. Because the part is picked from below, the loading station has to be free of chip and coolant build-up, which is what actually limits continuous running. Automated loading is therefore not simply "pick it up and put it in".

10

Automatic inspection after machining

Where the project needs an in-process quality decision, an inspection unit can be added after the vertical lathe, configured to the requirement:

  • Present / absent
  • Dimensions
  • Appearance
  • Bore
  • Orientation
  • Burr and defect
  • Character recognition
  • Barcode recognition

Forming:

  1. EMAG vertical lathe
  2. Automatic unloading
  3. Vision or dimensional inspection
  4. OK to the finished-parts area
  5. NG to the reject area

The line then runs from automatic machining to automatic machining plus automatic judgement plus automatic sorting. On this site the corresponding line is 08 Vision Inspection Systems.

11

When a gantry fits, and when a robot fits

Neither option is automatically better; the shop decides.

ItemLoading conveyor and gantrySix-axis robot
Feed objectBlank trays and the loading conveyorSeveral tray types and several loading lanes
Motion formLinear axes on a fixed pathMulti-joint flexible path
ChangeoverTray and conveyor change neededComparatively flexible
Sorting linkNeeds an extra discharge stationCan join the same cell
Inspection linkPossible, needs an extra stationEasier, can join the same cell
Typical caseStable batches of one sizeSeveral sizes needing separation and sorting

The final choice also depends on the spindle down travel, the loading station height, the cycle, the number of machines and the safety area.

12

What a EMAG vertical lathe project needs to be quoted

For an automation retrofit, prepare the following before the first review:

Part

  • Part name
  • Part photo
  • Length
  • Diameter
  • Height
  • Weight
  • Material
  • Incoming condition

Machining

  • Cycle time
  • Machining program
  • Machining time per part
  • Daily output
  • Monthly output
  • Number of operations

Machine

  • EMAG model
  • Number of machines
  • Chuck size and gripping range
  • Loading conveyor type and buffer count
  • Spindle pick-up travel
  • Discharge conveyor type
  • In-plant space and machine layout

Automation

  • Gantry or robot
  • Automated part storage
  • Flipping
  • Vision
  • Inspection
  • Multi-machine line
  • MES

Site

  • Plant size
  • Machine positions
  • Safety area
  • Loading and unloading space
  • Walkways

The more complete these documents are, the closer the concept is to the real job.

13

EMAG vertical lathe loading: implementation focus

A project lands on the shop floor when these are verified:

01 Part location

Whether the part reaches the pick-up position reliably.

02 Fixture

Whether the robot gripper holds parts in different states reliably.

03 Machine interface

Whether the robot and the machine exchange run states reliably.

04 Cycle time

Whether the robot cycle matches the machine cycle.

05 Exception handling

How the system pauses, resets and recovers from a failed pick, a machine alarm or a part that is not in position.

06 Safety

Safety door, light curtain, safety area, emergency stop, robot safety and the human-robot boundary.

07 Manual takeover

Whether an operator can step in quickly when the automation trips.

A stable automatic system is not only one that completes its motions in normal running: it is one that recovers safely and in a controlled way from an abnormal state.

15

EMAG vertical lathe loading and unloading: common questions

Can EMAG vertical lathes be loaded and unloaded automatically?

Whether a machine can be converted has to be confirmed against the specific model, the door width, the spindle chuck, the machining space, the part size and weight and the shop layout. A site survey is carried out before the design.

EMAG vertical lathe loading: robot or gantry?

A gantry robot can be assessed when the machines stand in a row, the loading path is clear and the batch is stable; a six-axis robot is assessed first when the part has to be flipped, moved between stations or run as a mixed-part cell.

Can EMAG vertical lathes work with automated part storage?

Storage can be assessed against the part, the number of parts to be stored, the machine cycle and the available space. Capacity is calculated from the capacity per layer, the number of usable layers and the machining cycle — a fixed unattended running time is not promised.

Can one cell serve two EMAG vertical lathes?

A one-to-two configuration can be designed, but it has to be calculated on the cycle time of both machines, the door or exchange time, the pick-and-place time, the part weight, the robot travel and the distance between the machines.

Can EMAG vertical lathes run unattended?

Where part feeding, robot pick and place, the machine interface, the fixture, safety and exception recovery all meet the requirement, a continuously running automatic cell can be designed. The real degree of unattended running is confirmed per project.

What do you need for a EMAG vertical lathe loading project?

Start with the machine model, the part drawing or photos, part size and weight, the cycle time, the spindle chuck and fixture information, the number of machines and the shop layout.

Where does the loading motion happen on a vertical lathe?

The spindle carries the part: it moves down to the loading station, picks the part and moves up into the machining area. External automation therefore feeds the station continuously and separates the discharge, instead of reaching into the machine.

16

Project case information

Machine brand

as in the page title

Machine model

to be filled from the project record

Automation form

gantry robot / six-axis robot — from the project record

Part

to be filled from the project record

Part size / weight

measured data

Number of machines

measured data

Storage method

measured data

Cycle time

measured data

Inspection method

measured data

Project site

project material

These fields are kept as placeholders in the company's own format: nothing that has not been confirmed by project documents is written on the page. This page describes how loading and unloading is engineered for this machine family and brand line — it is not a claim that a project has been delivered on this machine. If you run machines of this brand, contact us to add real project information.

Note The brand and model information on this page comes from the company's own material and is used to explain the differences in automation fit between machine families, series and models. A brand name does not mean agency, authorization, certification or partnership, and does not mean that a project has been completed on a machine of that brand. Whether a specific model can be loaded and unloaded automatically has to be confirmed on site against the chuck, the door and guard structure, the fixture type and the layout.

Note

What this page is really saying

A EMAG vertical lathe can be organised around part feeding, automatic gripping, machine clamping, machining, unloading, inspection and finished-part collection into one complete automatic production cell. Whether that cell uses a gantry robot, a six-axis robot or automated part storage has to be designed around the part, the cycle, the number of machines and the shop layout.

Need a machine-tending concept for your part and machine?

Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.