Skip to main content
Machining Automation, Integrated · Engineered for the shop floor Kunshan · Dongguan · Ningbo, China
New PartnerIndustrial Automation Request a proposal

Starrag five-axis machining center loading and unloading

Starrag five-axis machining center loading and unloading: gantry robot or six-axis robot with automated storage and feeding, designed on the part and the cycle.

Robot loading and unloading workstation
Machine type · five-axis machining center · loading and unloading

Starrag five-axis machining center loading and unloading solution

Starrag five-axis machining center loading and unloading: gantry robot or six-axis robot with automated storage and feeding, designed on the part and the cycle.

five-axis machining center · robot automation
Overview

What Starrag five-axis machining center loading and unloading covers

This page covers one machine type: the five-axis machining center of Starrag, used where loading, clamping, unloading, part transfer and continuous production are still done by hand.

Starrag Group is based in Switzerland. Its main models include five-axis simultaneous machining centers.

Depending on the machine structure, the part size and weight, the cycle time, the fixture form, the production quantity and the shop layout, a cell can be built from a gantry robot, a six-axis robot, automated part storage, an automatic feeding mechanism, finished-part collection and an inspection unit, joining the manual handling motions into one continuous automatic cycle.

Where machining runs for long stretches, manual repetition has to come out and one operator has to cover several machines, the design has to answer seven questions at the same time:

  1. How the part is stored
  2. How the part is fed
  3. How the robot grips it
  4. How the machine clamps it
  5. How it is removed after machining
  6. How the finished part is collected
  7. How the next part comes in

Real five-axis machining center automation is therefore not one more robot on the floor: the machine, the feeding, the gripping, the fixture, the control and the safety interlocks form one production cell.

Starrag five-axis machining center automation: Drill & tap machining centers and a robot cell
Drill & tap machining centers and a robot cell
01

Why a Starrag five-axis machining center needs automated loading and unloading

In five-axis machining center work, manual loading and unloading usually consists of:

  • Lift or pick the blank
  • Align and locate it off-machine
  • Zero-point or fixture pre-clamping
  • Pallet into the machine
  • Machining wait
  • Pallet out
  • Remove the finished part
  • Record part data and traceability

When the cycle is stable, the part range is fairly uniform and the machine runs for long stretches, those repeated motions can be joined by an automation system. The machining characteristic here is long machining times and high part value, where consistency and traceability matter more than cycle time — which is exactly what makes the repeated motions worth fixing.

Taking Starrag as the example: Starrag builds five-axis simultaneous machining centers for high-value parts, where traceability alongside the handling is part of the requirement.

The system does not simply put a robot where an operator stood. It makes the following run in a fixed order:

  1. Feeding
  2. Picking
  3. Clamping
  4. Machining
  5. Unloading
  6. Collection

Add automated part storage and frequent manual replenishment turns into:

  1. Storage buffer
  2. Automatic feeding
  3. Robot picking
  4. CNC machining
  5. Finished-part collection

The concept for a Starrag five-axis machining center therefore has to be designed from the whole production cycle, not from a robot model number.

02

How a Starrag five-axis machining center loading and unloading system works

A typical automatic cycle can be designed as:

  1. Blank in
  2. Off-machine clamping and inspection station
  3. Part aligned and located
  4. Zero-point fixture pre-clamped
  5. Pallet buffer
  6. Robot or gantry picks the pallet
  7. Into the Starrag five-axis machining center pallet exchange position
  8. Pallet locked
  9. Machine confirms the lock and the part identity
  10. Swivel head and trunnion start simultaneous machining
  11. Machining complete
  12. Pallet out
  13. Finished part removed and data recorded
  14. Finished part collected or passed to inspection

Each of those motions needs its own state confirmation, for example:

  • Is the part located on the pallet
  • Is the pallet locked
  • Is the fixture clamped
  • Is the pallet exchange mechanism at the safe position
  • Has the part identity been read
  • Has the machining program finished
  • Was the finished part removed and recorded

The robot works through the pallet exchange position, so the swivel head and the table motion envelope, the pallet size and the usable in-machine space have to be confirmed in the design, and the pick path is simulated before the concept is fixed.

The stability of an automatic system comes from the interlocks between those states, not from robot speed alone.

03

Loading and unloading methods for a Starrag five-axis machining center

01 Gantry robot loading and unloading

A gantry robot normally runs on a fixed path. It suits: machines that stay in position and stand in a row, a clear loading path, a fairly stable part range with continuous batches, a defined cycle, and one robot serving several machines. Typical structure: automated part storage → gantry robot → machine → finished-part collection.

02 Six-axis robot loading and unloading

A six-axis robot has a larger working envelope. It suits: handling motions that are complex or need the part flipped, several machines plus an inspection station, a wide part range with frequent changeover, and connecting deburring, washing or inspection. Typical flow: storage → robot → machine → robot → inspection or finished-part area.

03 Automated part storage and feeding

Automated part storage is the link that turns manual bar handling into buffering: blanks queue in the magazine and the robot takes them to the cycle, so replenishment becomes a scheduled batch job instead of a per-part one. It suits sites that want to lengthen the replenishment interval, a fairly uniform part range that can be supplied by tray or basket, night shifts or long unattended stretches, and several lathes sharing one feeding and collection route.

Choosing between them

Handling unitMatching feed methodBetter suited to
Gantry robotStorage magazine plus a fixed feed laneMachines in rows, stable batches, a defined cycle
Six-axis robotStorage magazine plus trays or basketsSeveral part types, several stations, flipping and inspection
Gantry robot plus robotMagazine feeding, robot unloads and sortsA tight loading cycle where unloading needs separation and sorting

The handling unit and the feeding method are two separate decisions: they can be chosen independently or combined.

04

Starrag five-axis machining center with automated part storage

Where the shop needs more than automatic handling — where frequent manual replenishment also has to come out — automated part storage is added in front of the machine and the system becomes:

  1. Storage magazine
  2. Automatic discharge
  3. Location
  4. Robot or gantry
  5. Starrag five-axis machining center
  6. Machining
  7. Finished-part collection

The storage magazine can take on:

  • Blank storage
  • Part buffering
  • Automatic feeding
  • Part location and selection
  • Managing several batches
  • Finished-part buffering
  • Feeding several machines
05

One robot, two machines: Starrag five-axis machining center

When two Starrag five-axis machining centers have cycles, part sizes and a layout that suit shared feeding, the following can be designed:

  1. Storage magazine
  2. Gantry or robot
  3. five-axis machining center 1
  4. five-axis machining center 2
  5. Finished-part collection

That forms one multi-machine automation cell. A one-to-two configuration has to be calculated on:

  • The cycle time of both machines
  • The robot pick-and-place time
  • The door opening time of both machines
  • The part weight
  • The robot payload
  • The robot travel
  • The distance between the two machines
  • The storage capacity
  • The scheduling logic when both machines finish at the same time

Not every pair of machines can share one robot. If the two cycles differ widely, or the machines stand too far apart, the robot path, the buffering method and the feeding structure have to be re-assessed.

06

Three machines and multi-machine lines: Starrag five-axis machining centers

Extended further, the cell becomes:

  1. Storage magazine
  2. Robot
  3. Machine 1
  4. Machine 2
  5. Machine 3
  6. Inspection
  7. Finished parts

On a multi-machine line the focus has already moved from loading and unloading to production task scheduling, part buffering, robot path and machine status management. The system has to decide:

  • Which machine has finished
  • Which machine is waiting for a load
  • Which part should go into which machine
  • Whether the magazine holds the matching part
  • What the robot should do next
  • Whether the other machines keep running after one alarms

A third machine is not simply added to the cell: the whole task scheduling and buffering logic has to be redesigned.

07

Which parts suit Starrag five-axis machining center automatic loading

Whether a part suits automated loading is decided by the part first. Across the typical work of a five-axis machining center, the common candidates are:

Impellers and blades

  • Impellers
  • Blades
  • Blisks
  • Flow guide parts

Complex surfaces

  • Complex surface structural parts
  • Aerospace structural parts
  • Precision curved parts

Precision mould parts

  • Precision mould cavities
  • Mould inserts
  • High surface quality parts

Industry parts

  • Aerospace parts
  • Energy equipment parts
  • Medical device parts
  • Precision machined parts

Whether a specific part suits automatic loading has to be confirmed on size, weight, shape, material, cycle time, clamping method, locating datum and the pose it arrives in. A name such as "shaft" or "disc" on its own is not a conclusion.

Starrag five-axis machining center cell: Drill & tap machining centers arranged together
Drill & tap machining centers arranged together
08

Part characteristics decide the automation method

This is one of the most important layers of the selection. On a five-axis machining center:

Part conditionDesign focus
Uniform sizeFixed fixture and fixed feeding
Small sizePrecision location, purpose-made fixture, light-payload gripping
Heavy partRobot payload and fixture load matched to the chuck size
Several sizesChangeable fixture, configurable trays, recipe management
Fixed incoming orientationMechanical location
Random incoming orientationVision recognition / flexible feeding
Needs the other face machinedRobot flipping or a purpose-made flipping mechanism
Several operationsTransfer between operations by robot
Judgement needed after machiningAutomatic inspection plus OK / NG sorting
Long continuous productionAutomated part storage plus automatic feeding

The concept therefore starts from the part, not from a robot model number.

09

How Starrag five-axis machining center loading solves clamping

In automated loading the machine fixture is a critical link. On a five-axis machining center the clamping form is a zero-point system and a pallet, and the system has to consider:

  • Pallet and zero-point repeat location accuracy
  • Fixture type
  • Part locating and alignment datum
  • Clamp confirmation
  • Part-present detection
  • Interference between the fixture, the swivel head and the trunnion
  • Space to remove the finished part
  • Effect of difficult-to-cut material chips and coolant on the locating face

Typical working cycle:

  1. Pick the part off-machine
  2. Align and locate it
  3. Zero-point pre-clamping
  4. Pallet into the machine
  5. Pallet locked and confirmed
  6. Swivel head and trunnion machine
  7. Pallet out
  8. Finished part removed and recorded

The machine only moves to the next state after the clamped condition is confirmed. These are often difficult-to-cut materials, so chip form and the coolant method affect how clean the locating face stays. Automated loading is therefore not simply "pick it up and put it in".

10

Automatic inspection after machining

Where the project needs an in-process quality decision, an inspection unit can be added after the five-axis machining center, configured to the requirement:

  • Present / absent
  • Dimensions and geometric tolerance
  • Appearance
  • Curved surface profile
  • Orientation
  • Defect
  • Character recognition
  • Barcode and part identity

Forming:

  1. Starrag five-axis machining center
  2. Automatic unloading
  3. Vision or dimensional inspection
  4. OK to the finished-parts area
  5. NG to the reject area

The line then runs from automatic machining to automatic machining plus automatic judgement plus automatic sorting. On this site the corresponding line is 08 Vision Inspection Systems.

11

When a gantry fits, and when a robot fits

Neither option is automatically better; the shop decides.

ItemGantry robotSix-axis robot
Multi-machine lineSuits a fixed layoutSuits complex layouts
Spatial motionLinear axes; in-machine handling is limited by the structureMulti-joint, can work around the head and the trunnion
Flipping and pre-clampingOff-machine clamping is the normMore flexible, can flip and pre-clamp off-machine
Data traceabilityNeeds an added identity-reading stepEasier, can join the same cell
Layout changeBeam and travel have to be redesignedComparatively flexible
Typical caseSmall and medium parts in stable batchesHigh-value complex parts, mixed-part cells

The final choice also depends on the swivel head and trunnion motion envelope, the part weight, the pallet size, the cycle, the traceability requirement and the safety area.

12

What a Starrag five-axis machining center project needs to be quoted

For an automation retrofit, prepare the following before the first review:

Part

  • Part name
  • Part photo
  • Length
  • Diameter
  • Height
  • Weight
  • Material
  • Incoming condition

Machining

  • Cycle time
  • Machining program
  • Machining time per part
  • Daily output
  • Monthly output
  • Number of operations

Machine

  • Starrag model
  • Number of machines
  • Swivel head and trunnion size and motion range
  • Pallet or zero-point specification
  • Machine door width and usable in-machine space
  • Table load capacity
  • Machine layout

Automation

  • Gantry or robot
  • Automated part storage
  • Flipping
  • Vision
  • Inspection
  • Multi-machine line
  • MES

Site

  • Plant size
  • Machine positions
  • Safety area
  • Loading and unloading space
  • Walkways

The more complete these documents are, the closer the concept is to the real job.

13

Starrag five-axis machining center loading: implementation focus

A project lands on the shop floor when these are verified:

01 Part location

Whether the part reaches the pick-up position reliably.

02 Fixture

Whether the robot gripper holds parts in different states reliably.

03 Machine interface

Whether the robot and the machine exchange run states reliably.

04 Cycle time

Whether the robot cycle matches the machine cycle.

05 Exception handling

How the system pauses, resets and recovers from a failed pick, a machine alarm or a part that is not in position.

06 Safety

Safety door, light curtain, safety area, emergency stop, robot safety and the human-robot boundary.

07 Manual takeover

Whether an operator can step in quickly when the automation trips.

A stable automatic system is not only one that completes its motions in normal running: it is one that recovers safely and in a controlled way from an abnormal state.

15

Starrag five-axis machining center loading and unloading: common questions

Can Starrag five-axis machining centers be loaded and unloaded automatically?

Yes. Five-axis machines should use off-machine clamping plus pallet exchange first, to avoid interference between in-machine handling and the swivel head or trunnion. The pick path is simulated during the concept stage.

Why a pallet rather than in-machine pick and place on a five-axis machine?

The in-machine space is taken by the swivel head and the trunnion, so in-machine handling both consumes machining time and risks interference. Clamping off-machine and exchanging the whole pallet keeps downtime shortest.

Is automation worth it for small batches?

Where parts are valuable, manual work is error-prone or process traceability is required, it can be justified even in small batches: the gain is consistency, yield and traceable data rather than cycle time.

How is a one-to-two Starrag five-axis cell designed?

It has to be calculated on the pallet exchange cycle of both machines, the robot travel and the number of pallets, and the scheduling logic for part changeover and program calls has to be confirmed.

How far should traceability go?

At least part-level identification, the loading and unloading times and the machining program record, bound to the pallet number so a batch can be queried later.

What do you need for a Starrag five-axis loading project?

The machine model and the swivel head and trunnion specification, the part drawing with size and weight, existing fixture or zero-point information, the cycle time, the traceability requirement and the shop layout.

16

Project case information

Machine brand

as in the page title

Machine model

to be filled from the project record

Automation form

gantry robot / six-axis robot — from the project record

Part

to be filled from the project record

Part size / weight

measured data

Number of machines

measured data

Storage method

measured data

Cycle time

measured data

Inspection method

measured data

Project site

project material

These fields are kept as placeholders in the company's own format: nothing that has not been confirmed by project documents is written on the page. This page describes how loading and unloading is engineered for this machine family and brand line — it is not a claim that a project has been delivered on this machine. If you run machines of this brand, contact us to add real project information.

Note The brand and model information on this page comes from the company's own material and is used to explain the differences in automation fit between machine families, series and models. A brand name does not mean agency, authorization, certification or partnership, and does not mean that a project has been completed on a machine of that brand. Whether a specific model can be loaded and unloaded automatically has to be confirmed on site against the chuck, the door and guard structure, the fixture type and the layout.

Need a machine-tending concept for your part and machine?

Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.

Request an assessment Call +86 150 5020 2625