Skip to main content
Machining Automation, Integrated · Engineered for the shop floor Kunshan · Dongguan · Ningbo, China
New PartnerIndustrial Automation Request a proposal

HE63S Engine Block Lines: Exchange Time Inside a 96 s Line Cycle

The source describes several dozen HE63S HMCs.

Technical application analysis. Engine blocks and cylinder heads; HE63S horizontal machining centers; gantry-linked machining line.

Reference configuration and timing

  • The source describes several dozen HE63S HMCs.
  • Its line cycle of no more than 96 s already includes 25 s for handling, plus probing and other auxiliary work.
  • The stated 200,000-part annual capacity assumes 300 days and 21.3 operating hours per day.

Engineering evaluation

Map the timing boundary before adding times together. If the reported line cycle already includes exchange and inspection, adding another 25 s counts the same activity twice. Conversely, using the exchange alone ignores cutting and the line bottleneck.

Record each station’s machining, waiting and transfer on a common time axis. Separate the interval between completed parts from the time one block spends travelling through the complete line.

Selection conditions and evidence limits

Machine count is not precise enough to specify an exact layout. The source operating calendar is a capacity assumption, without an independent acceptance record or evidence of New Partner delivery.

Application questions

Is 25 s the finished-part cycle?

No. It is the handling component within the reported line timing.

Can the annual figure be guaranteed for another line?

No. Product mix, cutting work, operating hours, availability and inspection must be established for that line.

Sources and evidence

Reviewed 4 November 2026. Source statements and engineering evaluation are identified separately. The references do not establish a New Partner delivery or customer acceptance result.

Related applications and solutions

Need a machine-tending concept for your part and machine?

Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.

Request an assessment Call +86 150 5020 2625