Skip to main content
Machining Automation, Integrated · Engineered for the shop floor Kunshan · Dongguan · Ningbo, China
New PartnerIndustrial Automation Request a proposal

TAKISAWA TT-500GD: Dual Loaders and the 2.5-Second Loading Figure

The cited manufacturer material identifies the TT-500GD parallel twin-spindle CNC lathe with dual loading devices as standard.

Technical application analysis. Parts within the ordered loader envelope; TAKISAWA TT-500GD parallel twin-spindle CNC lathe; standard dual loading devices in cited configuration.

Reference configuration and timing

  • The cited manufacturer material identifies the TT-500GD parallel twin-spindle CNC lathe with dual loading devices as standard.
  • It reports 2.5 s loading time, without establishing a specific customer part or material.

Engineering evaluation

The two loaders must be evaluated with the spindle task allocation. Identical parallel operations, first-and-second-operation transfer and part reversal create different handling requirements.

For a fair comparison with an external six-axis robot, hold the workpiece and operation scope constant. Define whether air cleaning, chuck confirmation and finished-part discharge are inside the measured loading interval.

Selection conditions and evidence limits

The figure applies to the cited product configuration. Actual part envelope, gripper, options and the timing definition require manufacturer confirmation; it is not a 2.5 s machining guarantee.

Application questions

Does dual loading remove all non-cutting time?

No. Clamping, cleaning, door or access conditions and any transfer between operations still have to be accounted for.

What should a buyer request with the quoted loading time?

The test part, gripper arrangement, start and stop conditions, and a sequence showing which auxiliary actions are included.

Sources and evidence

Reviewed 4 November 2026. Source statements and engineering evaluation are identified separately. The references do not establish a New Partner delivery or customer acceptance result.

Related applications and solutions

Need a machine-tending concept for your part and machine?

Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.

Request an assessment Call +86 150 5020 2625