DMG MORI CMX U and PH 150: Pallet Capacity and Changeover
DMG MORI’s 2019 publication specifies 150 kg maximum load, with an optional 250 kg configuration.
Technical application analysis. Fixture-mounted workpieces; no specific part identified; DMG MORI CMX U five-axis vertical machining center; automated pallet handling.
Reference configuration and timing
- DMG MORI’s 2019 publication specifies 150 kg maximum load, with an optional 250 kg configuration.
- It lists either ten 320 × 320 mm pallets or six 400 × 400 mm pallets. These are alternative layouts.
- Pallet change time is less than 40 s. The cited system is operated directly through the machine CNC without an additional external control system.
Engineering evaluation
Pallet handling moves an already fixtured job into the machine. It does not pick loose blanks. Assess the pallet interface, fixture height, workpiece envelope and tool access before choosing storage capacity.
For mixed production, connect each pallet identity to the correct fixture, program and clamping state. Ten storage positions do not by themselves establish unattended running time; tool availability, chip removal and exception handling also matter.
Selection conditions and evidence limits
These are dated manufacturer specifications, not New Partner delivery results or a guarantee of current availability. Confirm compatibility, options and load definitions with DMG MORI for the ordered configuration.
Application questions
Is 250 kg the standard PH 150 load rating?
No. The cited publication gives 150 kg and identifies 250 kg as optional.
Can the ten-pallet layout use the stated 400 mm pallets?
The cited layouts pair ten positions with 320 × 320 mm pallets and six positions with 400 × 400 mm pallets; do not combine them.
Sources and evidence
- DMG MORI Technology Excellence 02/2019, PDF page 40 (English manufacturer specification)
- Source record 2 — cn.dmgmori.com.cn (Chinese reference)
Reviewed 4 November 2026. Source statements and engineering evaluation are identified separately. The references do not establish a New Partner delivery or customer acceptance result.
Related applications and solutions
- MH-500 HMC Automation: Separating Pallet Exchange from Part Loading
- MDH50 Pallet Changer Specifications: Resolving Conflicting Load and Time Data
- SW BA W02-22 Medical-Part Automation: Pallet Change versus Tool Change
- Explore the corresponding automation solution
- Browse the machine-tending application library
Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.
Request an assessment Call +86 150 5020 2625