C6245A Two-Lathe Gantry: 20 kg Parts and Alternative Outfeeds
The product description uses two C6245A lathes and right-side feeding.
Technical application analysis. Components up to 20 kg in the supplier description; two C6245A CNC lathes; heavy gantry with right-side storage.
Reference configuration and timing
- The product description uses two C6245A lathes and right-side feeding.
- It states parts within 20 kg and approximately 14–16 s for exchange.
- Discharge options include a chute, chain conveyor or return to storage.
Engineering evaluation
Choose the outfeed around surface protection and downstream handling. Each route changes travel and gripping actions, so do not assume all three share one measured cycle. Returning finished parts requires a clear pocket-state record.
Include both grippers, carried components, offset and inertia in gantry selection. Test unequal machining times and access for replenishment when the other machine is waiting for service.
Selection conditions and evidence limits
This is a supplier configuration, without a named accepted customer installation. Part dimensions, material and sustained production are not provided.
Application questions
Can a finished part return to the same storage system?
Yes in the stated option, but blank and finished positions need reliable state tracking.
Is 20 kg enough to size the gantry?
No. Tooling and dynamic load conditions also govern the axes and wrist.
Sources and evidence
Reviewed 4 November 2026. Source statements and engineering evaluation are identified separately. The references do not establish a New Partner delivery or customer acceptance result.
Related applications and solutions
- Heavy Gantry Tending for Long Injection-Molding Tie Bars
- Motor End-Cap Turning: Twin-Spindle Transfer and Gantry Design
- Okuma 2SP-2500H Twin-Spindle Turning: Four-Second Loading in Context
- Explore the corresponding automation solution
- Browse the machine-tending application library
Send the machine brand/model, part drawing or photo, blank and finished-part handling, single or multi-machine layout, target cycle and acceptance requirements.
Request an assessment Call +86 150 5020 2625